Angaston Hospital CSSD Upgrades

Location
Angaston SA
Sector
State Government
Client
Department for Infrastructure and Transport
Delivery Type
Construct Only

The Project

Stride were engaged by the Department for Infrastructure and Transport and SA Health, to complete the internal sterilization, refurbishment and fit out of existing CSSD and operating theatres at Angaston Hospital.

Works included removing all existing furniture, materials and equipment from the sterilization store, operating theatres 1 and 2, scrub rooms, waste corridor and bin store. Once cleaned, decontaminated, and refurbished, Stride then sourced all the new required medical equipment to ensure the hospital returned to its full running capacity.

Despite the challenges that come with working in a hospital, Stride are proud to be producing the quality work we are known for and continuing to strengthen relationships with our delivery partners.

Partner with us and stride towards a future of long-term growth and success.

Let's Chat

Download our capability statement.

Download